While deploying a new application module, the software vendor ships the application software along with appropriate SQL plan baselines for the new SQLs being introduced. Which two statements describe the consequences?()
A:The plan baselines can be evolved over time to produce better performance.
B:The newly generated plans are directly placed into the SQL plan baseline without being verified.
C:The new SQL statements initially run with the plans that are known to produce good performance under standard test configuration.
D:The optimizer does not generate new plans for the SQL statements for which the SQL plan baseline has been imported.
出自:Oracle认证