You plan to set up the Automatic Workload Repository (AWR) baseline metric thresholds for a moving window baseline. Which action would you take before performing this task?()
A:Compute the baseline statistics.
B:Take an immediate AWR snapshot.
C:Decrease the window size for the baseline.
D:Decrease the expiration time for the baseline.
出自:Oracle认证

完成拼图验证

按住下方滑块,将拼图拖到缺口处后松开。

拼图背景,将小拼图拖到缺口处
向右拖动滑块