When the order given by bridge may have bad results, the duty engineer should()
A:inform the captain for a further consideration, then perform it
B:inform the captain, and not perform it
C:stop the M/E immediately, and then inform the chief engineer
D:stop the M/E immediately, and then inform the captain
出自:海船船员证