During loading and discharging operations,in addition to when the cargo tanks have been properly filled,each inert gas system must be capable of maintaining a minimum gas pressure of().
A:150 millimeters of water pressure
B:125 millimeters of water pressure
C:100 millimeters of water pressure
D:75 millimeters of water pressure
出自:海船船员证