If it becomes necessary to pump bilges while a vessel is in port, which of the following procedures should be followed?()
A:Pump only if the discharge is led to a shore tank or barge
B:Pump only during the hours of darkness
C:Pump only on the outgoing tide
D:Pump only as much as is necessary
出自:海船船员证