During PSC inspection related to the ISM Code, of the Safety Management System (SMS) should be carried out if clear grounds are established()
A:a less favorable inspection
B:a more favorable inspection
C:a less detailed inspection
D:a more detailed inspection
出自:海船船员证

完成拼图验证

按住下方滑块,将拼图拖到缺口处后松开。

拼图背景,将小拼图拖到缺口处
向右拖动滑块