When the dock is refilled with water after docking repair, the first work which should be done by engineers is ()
A:igniting boiler
B:releasing air in sea water system
C:starting generator
D:cut off shore power
出自:海船船员证

完成拼图验证

按住下方滑块,将拼图拖到缺口处后松开。

拼图背景,将小拼图拖到缺口处
向右拖动滑块