In some cases facilities may be provided for emergency overriding oil pressure shutdown, if this facility is used, adequate warning must be given to ().
A:the bridge watch-keeper
B:the captain
C:the chief engineer
D:the engine room staff
出自:海船船员证

完成拼图验证

按住下方滑块,将拼图拖到缺口处后松开。

拼图背景,将小拼图拖到缺口处
向右拖动滑块