During which condition should the operator of a pedestal crane shutdown operations?()
A:Bunkering
B:High winds
C:Potable water spill on deck
出自:海船船员证

完成拼图验证

按住下方滑块,将拼图拖到缺口处后松开。

拼图背景,将小拼图拖到缺口处
向右拖动滑块