How should you signal the crane operator to raise the boom and lower the load?().
A:Extend arm with the palm down and and hold this position rigidly
B:Place both fists in front of the body with the thumbs pointing outward each other
C:Clasp hands in front of you body
D:Extend arm with the thumb pointing up, and flex the finger s in and out for as long as the load movement is desired
出自:海船船员证

完成拼图验证

按住下方滑块,将拼图拖到缺口处后松开。

拼图背景,将小拼图拖到缺口处
向右拖动滑块