The shear rams of a ship blowout preventer stack are used in emergency well control to().
A:close and seal around the drill pipe
B:close and seal around casing
C:cut off pipe inside the preventer stack
D:close and seal around drill collars
出自:海船船员证

完成拼图验证

按住下方滑块,将拼图拖到缺口处后松开。

拼图背景,将小拼图拖到缺口处
向右拖动滑块