Which of the following should be the FIRST step in removing a generator from parallel operation?()
A:Trip the generator off the switchboard
B:Turn off all electrical equipment
C:Remove the load from the "off going" generator
D:Increase the cycles of the generator staying on the line
出自:海船船员证