A bonding cable should be connected for cargo operations aboards a tank vessel as soon as the().
A:cargo has been loaded or discharged
B:cargo ghose is connected
C:cargo pumps are started
D:vessel is ready to handle cargo
出自:海船船员证

完成拼图验证

按住下方滑块,将拼图拖到缺口处后松开。

拼图背景,将小拼图拖到缺口处
向右拖动滑块