After resolving the trouble of main power supply, main switch of emergency generator should(), if power supply is refreshed.
A:be switched off by the duty officer
B:be switched on by the duty officer
C:be switched off automatically
D:be switched on automatically
出自:海船船员证

完成拼图验证

按住下方滑块,将拼图拖到缺口处后松开。

拼图背景,将小拼图拖到缺口处
向右拖动滑块