Which of the following is not necessary to consider when surveying a potential site? ()
A:Space for antennas
B:Frequency allocation
C:Electrical power availability
D:Permission/Contract with owner
E:Availability of PCM link to the BSC
出自:中国移动网络维护生产岗位