Which of the following is not necessary to consider when surveying a potential site?()
A:Space for antennas
B:Frequency allocation
C:Electrical power availability
D:Contract with owner
E:Availability of transmission to the BSC
出自:中国移动网络维护生产岗位

完成拼图验证

按住下方滑块,将拼图拖到缺口处后松开。

拼图背景,将小拼图拖到缺口处
向右拖动滑块