As per UCP600, the words “to”, “till”, “from”, “between” when used to determine a period of shipment include the date or dates mentioned, the words “before” and “after” exclude the date mentioned. ()
出自:外贸业务员

完成拼图验证

按住下方滑块,将拼图拖到缺口处后松开。

拼图背景,将小拼图拖到缺口处
向右拖动滑块